News

Novocherkassk Electrode Plant Started Preparatory Works for New RIEDHAMMER Furnace

Novocherkassk, November 02, 2018. EPM-Novocherkassk Electrode Plant (EPM-NEP, part of EPM Group) launched an investment project for the construction of a modern RIEDHAMMER incipient roasting ring furnace. The new furnace will be built in the baking shop in place of decommissioned equipment, and preparatory general construction works are underway.

Delivery of the main and auxiliary equipment of the furnace is scheduled for the 1st half of 2019. All works on the project shall be carried out in strict accordance with the approved schedule. RIEDHAMMER incipient roasting ring furnace is scheduled for commissioning in Q4 2019. The total cost of the project will be more than RUB 1.5 billion.

Managing Director of EPM-NEP Evgeniy Churikov noted: “The construction of the modern furnace is a key investment project of our Plant aimed at improving the quality and increasing the output of graphite electrodes with diameter of 610 mm.”

RIEDHAMMER furnace significantly exceeds the current counterparts in terms of process KPIs and provides high performance, premium product quality, control automation and allows achieving reference indices in terms of ecology and energy efficiency.

Construction of a modern RIEDHAMMER furnace complete at EPM – NEP
EPM-Chelyabinsk Electrode Plant shuts down anode production
EPM-NovEP launches an EIRICH mixing plant to celebrate the 45th anniversary of the production site
EPM-NOVEP INTRODUCED A NEW RING COAL-TAR LINE
EPM-NOVEP LAUNCHED THE ASSEMBLY OF THE GERMAN EIRICH MIXING PLANT
The Ministry of Industry and Trade of the Russian Federation, Government of the Rostov Oblast, and the EPM Group has signed a special investment contract valued at 2.7 bln rubles
Novosibirsk marked the opening of a traveling photo exhibition dedicated to the 45th anniversary of the EPM – Novosibirsk Electrode Plant
A robot-assisted nipple manufacturing centre has been officially commisioned at EPM-NEP
EIRICH Mixing Plant Arrives at EPM-NovEP
Preparatory works for installation of the German mixing plant EIRICH have started at EPM-NovEZ
Equipment Delivered to EPM-NEP Nipple Centre
New Equipment for Production of Electrode Paste Briquettes Put into Operation at EPM-NovEP
Donсarb Grafit has put new equipment into operation
EPM-NEP will have new high-precision measuring equipment for graphite electrode nipples
Novocherkassk Electrode Plant Started Preparatory Works for New RIEDHAMMER Furnace
ENERGOPROM Group Announces Rebranding
ENERGOPROM Group Put Into Operation the First Private Environmental Monitoring Station in Chelyabinsk
ENERGOPROM has commissioned a new pitch impregnation line at Novocherkassk Electrode Plant
Novocherkassk Electrode Plant launches modernized baking furnace
Evgeniy Churikov Appointed Managing Director of Novocherkassk Electrode Plant
The Chelyabinsk plants of ENERGOPROM Group present their environmental initiatives to regional experts
Acting Governor of Novosibirsk Region Andrei Travnikov Makes a Working Visit to Novosibirsk Electrode Plant
ENERGOPROM Group takes part in a discussion of prospects for development of the coal and graphite industry in Russia
ENERGOPROM Group and SOLVER signed an agreement for construction of the Nipple Center at Novocherkassk Electrode Plant
Chelyabinsk Branches of ENERGOPROM Have Created an Integrated Environmental Center
ENERGOPROM Group and EIRICH GMBH have executed a contract for continuous intensive Mixer for the Novosibirsk Electrode Plant
TMK and ENERGOPROM signed a long-term contract for graphite electrodes supply
ENERGOPROM and RIEDHAMMER GmbH started construction of a new furnace at Novocherkassk Electrode Plant
RUSAL and ENERGOPROM Entered Into a Long-Term Anode Block Supply Contract
Chelyabinsk Electrode Plant's Output Increased 40 % in 2017
RUSAL and ENERGOPROM Sign a Long-Term Contract for Supply of Graphite Products
The Quality Management System at the Chelyabinsk Electrode Plant Certified by International Auditors
ENERGOPROM Group Developed Conceptually New Product for Emirates Global Aluminium
ENERGOPROM Group Made General Agreement for Cooperation with 1C
ENERGOPROM Group announces the request for quotation to the lot of UHP and SHP graphitized electrodes
Announcement
ENERGOPROM Group started production of the UHP-610 graphite electrodes at the Novosibirsk Electrode Plant
Statement from energoprom group on the special safeguard investigation into graphitized electrodes
Energoprom Launches Facebook Account